Lazy River Replacement

Lazy River Liner Replacement Project 

The life-cycle liner replacement project is now complete.

What happened? 

  • Previous annual routine maintenance inspections confirmed the lazy river liner was nearing the end of its service life and required replacement.
  • The project was originally scheduled for fall 2026 and had been advanced to 2025 to prevent interim failures and avoid repeat repair costs.

Why this is the right fix:

  • The new engineered liner supplied by the original equipment manufacturer will restore the Lazy River and extend the life of the feature. The liner includes a 15-year manufacturers warranty and provides a long-term solution compared to short-term repairs.

Thank you

  • We appreciate your patience while we completed this work. It will help keep the facility safe, reliable and in good shape for many years to come.