Permits
Depending on the size and location a lot grading permit may be required.
A development permit is required for any structure over 20m2.
A building permit is required for any structure over 10 m2 .
An accessory building is a structure that is not attached to a principal building.
Step 1: Apply
Depending on the scope of your project, you will require a variety of permits.
To establish if a lot grading permit is required, please submit inquiry, including a plan (if possible) for preliminary review to Engineering Services at lotgrading@cityofgp.com
Please submit a complete Development Application, Lot Grading and Building Permit application.
Please submit a complete Sub Trade Application for all sub trade permits required as per the scope of work for the project.
Step 2: Approval
Once a complete application is received, all permits will be issued within 2- 7 business days.
In the event a variance is required for an addition, timelines may extend up to 25 days.
Step 3: Construction
You may begin construction once you have received all required permits. Below is the contact information you may need for groundwork and utilities.
Each site is required to have an approved Fire Safety Plan posted on-site during construction.
Step 4: Inspections
All required inspections are listed on the conditions issued with the permit.
it is the Permit holder's responsibility to ensure all inspections are requested and received.