The City's Road Rehabilitation Program consists of three types of road work: road reconstruction, road overlay, and full depth reclamation (FDR). Each program and its sites are explained below.
If you have questions regarding the Road Rehabilitation Program or are seeking more information, please call the AccessGP at 780-538-0300 or 311 if you're within city limits.
Road Overlay
A road overlay includes removing and replacing the existing asphalt pavement, which is typically the top layer of the road structure. This process is used to extend the life of a roadway currently showing cracks and potholes.
Scope of Construction:
Road overlay
Milling existing road surface
New pavement
Spot replacement of curb and sidewalks
Minor repairs to storm sewer infrastructure
Road and crosswalk line marking
Landscaping
Proposed Completion: End of June 2024
Scope of Construction:
Road overlay
Milling existing road surface
New pavement
Spot replacement of curb and sidewalks
Minor repairs to storm sewer infrastructure
Road and crosswalk line marking
Landscaping
Proposed Completion: Summer 2024
Scope of Construction:
Road overlay
Milling existing road surface
New pavement
Spot replacement of curb and sidewalks
Minor repairs to storm sewer infrastructure
Road and crosswalk line marking
Landscaping
Proposed Completion: Summer 2024
Locations:
115 Street between 95 Avenue and 97 Avenue
95 Avenue between 113 Street and 116 Street
96 Avenue between 113 Street and 115 Street
113 Street between 95 Avenue and 97 Avenue
Road Reconstruction
Road reconstruction involves removing the existing road structure and replacing it with a new one. A full reconstruction occurs when the roadway is past the point of intervention.
Scope of Construction:
Proposed Completion:
Full Depth Reclamation
Full-depth reclamation includes breaking apart the existing road pavement, recycling some materials, and mixing them into the road's lower levels and base structure. Cement and foamed asphalt are mixed into the structure and compacted. Once this is complete, a new asphalt pavement structure is laid on top.
Lakeland Drive Culvert Crossing
Location: 95 Street and 123 Avenue
Scope of Construction: Replacement
Replace existing structure with concrete design
Install new manholes
Surface repairs
Proposed Completion: July 2024