On May 16, the City of Grande Prairie begins repairs on the 99 Avenue bridge between 102 Street and 105 Street.
The work includes:
- replacing the road surface
- replacing or repairing damaged sections of the bridge rail
- repairing minor cracks on the concrete components of the bridge including the pedestrian and vehicle barrier, support structures, and curbs
- repairing the retaining walls at either end of the bridge and the pier
During construction, traffic is reduced to a single lane along 99 Avenue and the trail that runs under the bridge will be closed. Pedestrians will be rerouted along a marked detour north of the bridge.
Construction is expected to be completed in early August.
For more information on construction, visit cityofgp.com/construction2022 or contact the City by phone at 311 or e-mail at info@cityofgp.com.