A storm sewer connection permit must be obtained prior to constructing a connection to the city's storm sewer system.
Fees and Timelines
There is a $500.00 fee associated with storm sewer connection permits. Basic engineering fee includes an on-site consultation, pre-construction inspection and final inspection. Permit requests are processed within three business days of being received.
Additional Information
- Detailed engineering drawings and site plan must be submitted with completed application form.
- Please review the Construction Manual for storm connection details.
- Fees schedule available on Bylaw C-1395 Fees and Charges; scroll to Connection Permits/Agreements #10.
- Additional securities, as determined from the Security Requirements for Work Within the Right-of-Ways, will be required
Submission Information
Completed requests may be emailed to eng_permits@cityofgp.com or dropped off at the City Service Centre.
Attention: Field Inspector
City Service Centre, P.O. Bag 4000
9505 112 Street
Grande Prairie, AB. T8V 6H8
Questions
If you have questions or would like to speak to the Field Inspector, please email eng_permits@cityofgp.com.
Also Known As
Engineering Services Permit