The following pages outline the requirements, processes, and resources for commercial property development.
Base Building
Permit
A lot grading, development, building and all subtrade (electrical, plumbing and gas) permits are required to construct a base building.
A base building is considered to have exterior walls with minor interior construction for future tenant development. A demising wall or mezzanine may be built as part of a base building.
Cold Storage
Permits
Cold storage is an unheated structure likely with no electricity and is not classed for human occupancy.
A development and building permit are required. Depending on the scope, an electrical permit may be required.
Permit Fees
Fee Update Notice
Fees and rates will be updated effective January 1, 2026.
For questions about specific fees, please contact AccessGP at 311 or info@cityofgp.com.
Current fees (Until Dec. 31, 2025)
Development Permit
Development Permit $150.00
Lot Grading Permit
Commercial: Minimum of $220.00/ha to a maximum of $1100.00
Safety Code Permits
Building Permit Fee: This fee is established from the cost of construction
Electrical Permit Fee: This fee is based from the cost of installation
Safety Code Permits include a Safety Code Levy remitted to the Province.